The Cheesman Upstream Control Project included the ladder system, slide gate, the Lamer-Johnson Needle Valve, tunnel liners, control actuators and systems an accessory feature work, as well as installation of the new Jet Flow Gate, tunnel liner, and appurtenant support equipment. Rock excavation, concrete removal, new equipment installation, the new ladder system, electrical and control systems, and lighting equipment are also part of the project as well as the new 6 inch stainless steel fill line to be installed from the new Jet Flow gate to the Valve House.